Sprint Campus Garage Repair Program
Sprint Campus Garage Repair Program
Overland Park
Kansas
Chloride ion testing was performed in thirteen precast concrete parking garages at the Sprint World Headquarters Campus to establish the current level of chloride contamination at the floor topping slab. An emergency letter was submitted immediately after the field investigation showing locations of loose overhead spalls that could cause safety hazards to pedestrian and vehicular traffic. Reports for each garage described distress conditions and chloride ion test results and developed an order-of-magnitude opinion of probable repair costs.