Igloo Warehouse and Production Facility
Houston, Texas
Of the 55 acres that were developed, 45 were impervious: a 20-acre building and 25 acres of paving. The $440-million project has approximately 500 feet of combined drainage ditch and a large box culvert linking the north and south detention ponds. Intricate headwall structures and a large outfall control structure are also on site.
We prepared the drainage/detention report, provided construction administration, analyzed the water reservoir for fire demand and re-designed the sanitary sewer plant. We also provided site and land development, detention ponds, parking lot and all infrastructure to serve the site.