A better world in the making

For more than 90 years, we have been trusted to solve some of the most complex engineering challenges of our time. Since the beginning we’ve worked as a tightly interconnected team of experts and innovators bent on helping our clients build better environments and shape a better world. Our legacy of stewardship shows. More than half of our clients partner with us repeatedly, 200 of which have worked with us for more than 20 years.

1931 stutz

1931

Walter P. Moore, Sr. starts the firm and finances it by selling his Stutz Bearcat. He received the Stutz from his previous employer in lieu of wages.

Milestone Project

Clarke and courts rev

1936

Firm designs the Clarke & Courts Building. Listed on the National Register of Historic Places, the building is now the Houston Tribeca lofts.

First higher ed v2

1938

Southwestern University Cody Memorial Library is the first of 1,000+ major higher education facilities designed by the firm.

President house 2 1949 jpg 800x700 q85 1

1939

During the 1930s and 1940s, much of the practice is focused on designing premier homes. Rice Institute President's Home (pictured) is an example.

First aviation v2

1948

The Galveston Airport Terminal Building is the first of 200+ major aviation facilities designed by the firm.

First healthcare v2

1949

Houston Methodist Hospital Main Building is the first of 400+ major healthcare facilities designed by the firm.

First sports v2 0

1950

Rice University Football Stadium is the first of 250+ major sports facilities designed by the firm.

First commercial v2

1953

Houston's first modern skyscraper, the Melrose Building, is the first of 500+ major commercial buildings designed by the firm.

Milestone Project

Farnsworth chambers building rev

1954

Farnsworth & Chambers Building is designed by the firm. On the National Register of Historic Places, it later serves as NASA's first Houston headquarters.

First federal v2

1963

The Bob Casey Federal Building is an example of the 100+ major federal facilities designed by the firm.

First international v2

1963

Requiring major repairs after being severely damaged by a typhoon, Guam Memorial Hospital is the first of 100+ international projects designed by the firm.

Milestone Project

Astrodome

1965

The Houston Astrodome, the 8th wonder of the world, is designed by the firm.

Walter p moore jr young

1966

Following in his father's footsteps, Walter P. Moore, Jr. joins the firm after serving as the Technical Director for the US Army Corps of Engineers.

First cultural v2

1966

The Jesse H. Jones Hall for the Performing Arts is the first of 100+ major cultural and performance facilities designed by the firm.

Milestone Project

0562 78 miller outdoor theater exterior

1967

One of the firm's first projects to use computers during design is the Houston Miller Outdoor Theater in Hermann Park.

First parking v2

1971

The Downtown Houston Tenneco Garage is the first of 750+ parking facilities designed by the firm.

Milestone Project

Fbi academy

1972

Firm designs the FBI Academy located in Quantico, Virginia.

Turner moore cummings zimmerman

1973

A Walter P Moore subsidiary, Turner, Moore, Cummings, Zimmerman is formed to provide civil engineering. It later is named the Project Division, a predecessor to the firm's Infrastructure Group.

Opening mobile 0

1973

Mobile, Alabama office opens to provide structural and civil engineering.

Opening beaumont 0

1974

Beaumont, Texas office opens to provide civil engineering.

Milestone Project

Two houston center 2

1974

Firm designs Two Houston Center, the first of three buildings the firm will design for the Houston Center complex.

Wpm sr eng of year

1974

Walter P. Moore, Sr. is named Engineer of the Year by the Texas Society of Professional Engineers Greater Houston Chapter.

Milestone Project

The summit rev

1975

Firm designs its first NBA arena, the Houston Summit.

Lee w slade

1976

Lee Slade joins the firm as a graduate engineer from Rice University.

Walterpmoore jr

1978

Walter P. Moore, Jr. is named the firm's second President.

Group traffic transportation

1978

Firm establishes a Traffic and Transportation Engineering practice.

Las colinas

1979

The firm forms a joint venture with Datum and opens a North Texas office to provide structural engineering for Williams Square at Las Colinas.

Ray messer joins firm rev

1981

Ray Messer joins the firm, bringing his knowledge and experience in post-tension design.

Opening san antonio 0

1981

San Antonio, Texas office opens to redevelop the Hemisphere.

50th anniversary logo

1981

Firm celebrates its 50th anniversary with a party in Houston Center which was designed by the firm.

Walterpmoore sr

1983

Walter P. Moore, Sr. passes away.

Milestone Project

Img 0575

1983

Firm designs the tallest building in Fort Worth, Texas, Burnett Plaza, a 40-story, 1 million SF office building.

Milestone Project

1199 65 va hospital

1983

Firm provides structural, civil and traffic engineering for the Michael E. DeBakey Veterans Affairs Medical Center, at the time the largest (1.8 million SF) medical complex ever built by the VA. The firm developed a new structural system to accommodate 1.2 million SF of interstitial space.

Opening tampa 0

1984

Tampa, Florida office opens to provide structural engineering.

Walter jr eng of year

1985

Walter P. Moore, Jr. is named Engineer of the Year by the Texas Society of Professional Engineers Greater Houston Chapter.

Milestone Project

Astrodome renovation

1988

Having been involved in the original design of the world's first domed stadium, the firm provides structural engineering for the expansion and renovation of the historic Houston Astrodome.

Opening dallas 0

1989

Dallas, Texas office opens to provide structural engineering.

Opening atlanta 0

1989

Atlanta, Georgia office opens to provide structural engineering.

Raypresident

1992

Ray Messer is named the firm's third President and Chief Executive Officer.

Leadership skills development

1993

Firm establishes the Leadership and Skills Development Program, an internal employee learning program that provides technical, management, corporate and personal development courses to support their professional growth.

Wpmjratsite2 rev

1994

Walter P. Moore, Jr. retires from full-time management of the firm and joins Texas A&M University as a professor to pursue his passion for education and practical research.

Group diagnostics

1994

Firm establishes the Technical Resources Management practice which later becomes the Diagnostics Group.

Larry griffis tr higgins award

1994

Larry Griffis receives the T. R. Higgins Lectureship Award given by the American Institute of Steel Construction. This award recognizes outstanding lecturers and authors for their contribution to the engineering of fabricated structural steel.

Group parking

1996

Firm acquires Parking Pros, a parking consulting firm, and establishes a Parking practice.

Opening orlando 0

1997

Orlando, Florida office opens to provide structural engineering.

Wpm jr death

1998

Walter P. Moore, Jr. passes away following a tragic auto accident.

Ray messer cofb rev

1998

Ray Messer is named the firm's Chairman of the Board.

First sustainable v2

1999

Georgia Institute of Technology's Technology Square is the first of 100+ sustainable facilities designed by the firm.

Opening kansas city

1999

Firm acquires Kerr Conrad Graham Associates and opens an office in Kansas City, Missouri to provide structural and civil engineering.

Group water resources

1999

Firm establishes a water resources engineering practice.

Greenbuild council logo

2000

USGBC LEED rating system is unveiled.

Milestone Project

Best minute maid park courtesy walter p moore photog russ andorka 45260008

2000

Firm designs Minute Maid Park, the first retractable roof ballpark.

Opening austin 0

2001

Austin, Texas office opens to provide structural engineering.

Dilip choudhuri

2001

Dilip Choudhuri joins the firm, bringing his knowledge and experience in diagnostics.

Greenbuild International Conference Logo

2002

First Greenbuild International Conference is held in Austin, Texas. This conference brings together industry leaders, experts and professionals dedicated to sustainable design.

Ecoworks

2002

Firm provides structural engineering for it's first LEED certified building, only one of 23 buildings to be certified in the US at that time. EcoWorks, Lenexa, Kansas

Greenbuild council logo

2002

Firm joins US Green Building Council (USGBC) as a corporate and continues to be a member.

LEED AP logo

2002

Firm's first LEED Accredited Professional (AP) is accredited. Today the firm has over 50 LEED APs.

Milestone Project

Nrg

2002

Firm designs the award winning Reliant Stadium (now NRG), the first NFL stadium with a retractable roof.

Larry griffis lifetime achievement

2002

Larry Griffis receives the Lifetime Achievement Award given by the American Institute of Steel Construction (AISC). This award honors living individuals who have made a difference in AISC and the structural steel industry's success.

Opening la

2003

Los Angeles, California office opens to provide structural engineering.

Rinker hall

2005

Rinker Hall is the firm's first project to be recognized as one of the AIA's Committee on the Environment (COTE) Top 10 Projects. The design includes provisions for design for adaptability and deconstruction. Rinker Hall at University at Florida, Gainesville, Florida

Opening las vegas 0

2005

Las Vegas, Nevada office opens to provide structural engineering.

Milestone Project

Number 5 bim image cropped1

2005

As part of General Services Administration's BIM Pilot Program, firm designs the Federal Courthouse in Jackson, Mississippi. It is the firm's first project using building information modeling.

Mm park 2 mda event

2006

Firm celebrates its 75th anniversary with "Diamond on the Diamond" party at Minute Maid Ballpark which was designed by the firm and is the first retractable roof ballpark.

Milestone Project

Blake marvin hks 08606 092

2006

Firm designs the world's largest LEED Certified project, the Palazzo in Las Vegas, Nevada.

Milestone Project

Best int111dougherty10 06

2006

Firm designs the first NFL stadium with a retractable field, University of Phoenix Stadium (now State Farm Stadium). The retractable field offers optimal growing conditions for the natural grass, and gives the stadium flexibility to host other world-class events.

Milestone Project

Best sprint ctr venues 0484

2007

Firm designs the Kansas City Sprint Center, a multi-purpose arena that can accommodate NBA basketball, NHL hockey, AFL arena football, and almost any other type of special event.

Kaust

2008

Firm provides structural engineering for the world's largest LEED Platinum project. King Abdullah University for Science & Technology, Kingdom of Saudi Arabia

Houston center

2008

Walter P Moore's headquarters office is the third LEED Silver project in Houston.

Milestone Project

Kaust 08 024 copyright hok

2008

Firm designs the world's largest LEED Platinum project, the King Abdullah University for Science & Technology, Kingdom of Saudia Arabia.

Rafael sabelli 2x3 2015 1

2008

Rafael Sabelli shares the T. R. Higgins Lectureship Award given by the American Institute of Steel Construction with Walterio Lopez. This award recognizes outstanding lecturers and authors for their contribution to the engineering of fabricated structural steel.

Milestone Project

Lucas oil stadium

2008

Firm designs the Lucas Oil Stadium, a multipurpose venue that can host football, basketball, conventions and a range of special events. It is the first US retractable roof to move on multiple, parallel rails.

Opening san francisco 0

2008

San Francisco, California office opens to provide structural engineering.

Opening dc 0

2008

Washington, DC office opens to provide structural engineering.

Opening tulsa 0

2008

Tulsa, Oklahoma office opens to provide civil engineering.

Opening el paso 0

2008

El Paso, Texas office opens to provide traffic engineering.

Edwin friedrichs

2009

Edwin Friedrichs is named Engineer of the Year by the Texas Society of Professional Engineers Greater Houston Chapter.

Milestone Project

Best mg 9486 2 copy

2009

Firm designs the AT&T Stadium. At its opening the stadium design set several world records including the longest single-span roof structure, largest center hung HD video display, and biggest operable glass doors.

Larry griffis kimbrough award 0

2009

Larry Griffis receives the prestigious J. Lloyd Kimbrough Award given by the American Institute of Steel Construction. This award honors engineers and architects who are recognized as pre-eminent steel designers.

Greenroads international logo

2010

Greenroads International Rating System is established. The certification process is for sustainable transportation development projects in the U.S. and internationally.

Helios plaza

2010

Firm provides structural, civil and traffic engineering, and parking consulting for the first Houston project to receive LEED Platinum. Helios Plaza, Houston, Texas

Kaust

2010

Firm's project is recognized as one of the AIA's Committee on the Environment (COTE) Top 10 Projects.

Opening panama

2010

Panama City, Panama office opens to provide structural engineering and parking.

Unt stadium

2011

Firm provides structural engineering for the first newly constructed stadium to receive LEED Platinum. The University of Texas Apogee Stadium

Institute for sustainable infrastructure

2011

The Institute for Sustainable Infrastructure, a joint venture of the American Public Works Association, the American Society of Civil Engineers, and the American Council of Engineering is established. Walter P Moore becomes a charter member.

Opening pune

2011

Pune, India office opens to provide structural engineering.

Dave platten

2011

Dave Platten receives the Special Achievement Award given by the American Institute of Steel Construction for his leadership on the AT&T Stadium, an innovative and record-setting long-span structure.

Milestone Project

Marlins ballpark

2012

Firm designs the Florida Marlins Ballpark. The 300,000 SF retractable roof is designed to endure extreme hurricane force winds.

Dodson

2012

Firm acquires Dodson, a water resources engineering firm.

Milestone Project

Bagby

2013

MILESTONE PROJECT - Firm provides civil, traffic, transportation, and water resources engineering for the Bagby Street Reconstruction, the first project to receive a Greenroads Certification in Texas.

Envision sustainability logo

2013

Firm's first Envision Sustainability Professional (ENV SP) is accredited. Today Walter P Moore has 11 ENV SPs.

Milestone Project

Bagby

2013

Firm provides civil, traffic, transportation, and water resources engineering for the Bagby Street Reconstruction, the first project to receive a Greenroads Certification in Texas.

Rafael sabelli 5x7 2 2015

2013

Rafael Sabelli receives a Special Achievement Award given by the American Institute of Steel Construction. This award honors his literary contributions on seismic design of steel and composite structures.

Capitol tower

2014

Capitol Tower, a Walter P Moore structural, civil and traffic engineering and parking consulting project, is one of 100 projects selected for the beta test of LEED Version 4 (V4), and is one of three projects in the world to achieve LEED v4 Core and Shell Platinum Pre-Certification. Capitol Tower, Houston, Texas

Dirk kestner 5x7 1 2014

2014

Dirk Kestner appointed Director of Sustainable Design.

city of austin sustainability challenge logo

2014

City of Austin hosts the 1st Annual Green Cup Challenge to promote sustainability. Walter P Moore's Austin office wins the inaugural challenge.

Carbon leadership forum logo

2014

Walter P Moore becomes Gold Sponsor of the Carbon Leadership Forum, an industry-academic collaboration committed to advancing low carbon building design and construction.

Dilip choudhuri 5x7 1 2013

2014

Dilip Choudhuri is named the firm's fourth President and Chief Executive Officer.

Group ee

2014

Firm establishes an Enclosure Engineering practice.

Dirk kestner 5x7 1 2014

2014

Dirk Kestner is named the firm's Director of Sustainable Design.

Mickey leland

2015

Firm provides engineering for the repositioning and reskinning of an existing federal building. Walter P Moore develops a performance based wind design that is recognized with a LEED Innovation point. Mickey Leland Federal Building, Houston, Texas

ceres organization logo

2015

Firm signs the Building and Real Estate Climate Declaration. The declaration campaign is a collaboration between the USGBC, the Carbon Leadership Forum and Ceres.

city of austin sustainability challenge logo

2015

Firm's Austin office wins the City of Austin's 2nd Annual Green Cup Challenge.

city of houston by alisa matthews

2015

The City of Houston in partnership with the Institute of Real Estate Management hosts the Green Office Challenge. Walter P Moore's Houston office wins the tenant challenge.

Image of the Lyric Center Garage at night with color changing LED facade

2015

The firm's first, Green Parking Professional is certified. Today the firm has two Green Parking Professionals.

Group construction eng

2015

Firm establishes a Construction Engineering practice.

Lee slade 5x7 2013

2015

Lee Slade is named the firm's Chairman of the Board.

Opening calgary 0

2015

Calgary, Canada office opens to provide diagnostics and structural engineering.

city of houston by alisa matthews

2016

For the second year in a row, Walter P Moore headquarters office wins the City of Houston's Green Office Challenge in the tenant category.

La leed gold

2016

Firm's Los Angeles office achieves LEED CI Gold. The Walter P Moore staff provides full LEED consulting services for the interior fit out.

LEED certification logo

2016

USGBC's LEED v4 becomes mandatory. All new projects are required to register under v4.

Sfo wins grand conceptor

2016

San Francisco International Airport Air Traffic Control Tower wins ACEC National Engineering Excellence: Grand Conceptor Award

Opening okc 0

2016

Oklahoma City, Oklahoma office opens to provide infrastructure services in the capitol city.

Milestone Project

Daytona 02 21 16 ovrview roof time 947 1

2016

Daytona International Speedway

Opening nyc

2016

New York City office opens to provide consulting services to key clients and projects.

Opening fort worth

2017

Fort Worth, Texas office opens to provide expanded Water Resources, Diagnostics, and Infrastructure design services.

Milestone Project

Dailys timeline

2017

Daily's Place at Everbank Field

Milestone Project

Suntrust timeline

2017

Suntrust Park

Milestone Project

Allen pkwy timeline

2017

Allen Parkway Improvements

Opening san diego

2018

San Diego, California office opens to provide structural engineering and enclosure engineering.

Milestone Project

Emergency flood modeling v3

2018

Hurricane Harvey Emergency Flood Modeling

Milestone Project

Avenida houston v2

2018

Avenida Houston

Opening charlotte

2019

Charlotte, North Carolina office opens to provide structural engineering, enclosure engineering, construction engineering, secure design, and parking consulting.

Opening denver

2020

Denver, Colorado office opens to provide structural engineering.

Milestone Project

North exterior

2020

SoFi Stadium

Raleigh opening

2021

Raleigh, North Carolina office opens to provide structural engineering, enclosure engineering, construction engineering, secure design, and parking consulting.

Miami opening

2022

Miami, Florida office opens to provide forensic investigations, condition assessments, repair, and restoration design.

Mexico city opening

2022

Mexico City office opens to provide insurance and litigation support, waterproofing consulting, assessments and repairs, corrosion mitigation, bridge assessment, and flood evaluation.

Chicago office opening

2022

Chicago, Illinois office opens to provide forensic engineering, restoration & renovation, enclosure diagnostics, and parking restoration services.

Image history 02

Walter P Moore office in the 70s

Image history 03

Walter P. Moore, Sr.

Image history 01

Walter P Moore engineers working circa 1973

image of early walter p moore engineers at a drafting table

Engineers at a drafting table in the late 70s

Walter jr

Walter P. Moore, Jr.

1 / 1

Solving relentlessly

Over the decades we have delivered hundreds of projects, billions of square feet, and countless client achievements. Our resolve to innovate visionary solutions has resulted in nearly 1,500 industry accolades and several industry firsts. As evidenced in our historical timeline, the passionate pursuit of excellence has always been our way.

93

 

Years in business

1.7

B

Total square feet of structures completed

300

+

More than 300 parking structures restored

1350

+

Total awards for excellence in engineering